3 Fast CCTV Report Checks to Pass WSA 05 for Victorian Contractors

Interpreting a CCTV inspection report means checking that the package includes HD continuous video, defect screenshots tied to WSA 05 codes, a WinCan-compatible data export and an inclinometer graph. Skip any one of those and most Victorian utilities will bounce it back. The three fastest checks: video quality, a calibrated inclinometer, and one screenshot per coded defect.


TL;DR:

  • A compliant CCTV report must include continuous HD video, a structured WinCan data export, defect photos with distance markers, inclinometer readings, and detailed metadata.
  • Proper coding separates structural defects from operational issues, with condition grades 1 through 5 indicating urgency, and peak scores influencing overall segment assessment.
  • Video clarity, photo labeling, and accurate inclinometer measurements within ±1% are essential, and flawed data or misdirected surveys often cause report rejections.
  • For immediate repairs, Grade 5 structural defects require urgent action, while Grade 3 to 4 defects are suitable for scheduled relining or spot repairs.
  • Submission packages should always include standardized file formats, metadata, and CAD views, with proper file naming and knowledge of local supplements to the WSA 05 code.

Table of Contents

What Does a Compliant CCTV Drain Report Actually Include?

A CCTV report is not just a video file with a cover sheet. Utilities and councils treat it as an evidence package, and the WSA 05-2020 Conduit Inspection Reporting Code of Australia (Version 4.1) sets out what belongs in it. Miss a piece and the report is functionally useless to whoever has to act on it.

Expect these components in every compliant submission:

  • Continuous HD video for each inspected segment, captured at a steady crawl speed with no gaps at joints or connections.
  • A WinCan-compatible structured data export, not just a PDF summary. Councils and asset managers prefer the raw database because it drops straight into their asset-management systems without transcription errors, a point Orbital’s WSAA compliance guidance makes clear.
  • One photo per coded defect, plus general reference photos roughly every 20 to 25 meters.
  • An inclinometer readout plotted as an inclination graph, showing pipe gradient along the run.
  • Header metadata: inspection reason, crew details, calibration records, and maintenance structure references (the pits or manholes the survey started and finished at).

If your report is missing the WinCan file and arrives as a PDF only, treat that as a red flag before you even open the video. Our drain mapping guide covers how these deliverables feed into civil commissioning and handover.

How Do You Read WSA 05 Defect Codes and Condition Grades?

WSA 05 splits every defect into two categories, and mixing them up is the single most common misreading contractors make.

  1. Structural (STR) codes flag physical damage to the pipe wall: cracks, fractures, deformation, or joint displacement. These affect long-term integrity and usually drive repair timing.
  2. Service or operational (SRV) codes flag things blocking flow: roots, grease, debris, or scale. These affect performance today but don’t necessarily threaten the pipe itself.
  3. Condition grades run 1 to 5. Grade 1 means no significant defect. Grade 5 typically signals collapse or imminent failure requiring urgent action. Grades 3 and 4 are where most disputes happen, since they cover the gap between “monitor it” and “fix it now.”
  4. Peak versus average scoring matters because a single severe defect (peak) can outweigh a run of minor ones (average) when WSA 05 calculates the overall segment grade.
  5. Maintenance structure scoring is assessed separately from the pipe itself, and a pit in poor condition doesn’t automatically mean the connecting pipe is.

Watch for coding errors where an operational issue gets logged as structural, inflating the apparent urgency of the repair.

Checking the Video, Photos, and Inclinometer Data

Reading the codes is only half the job. You also need to confirm the media backing them up actually supports what’s written.

Run through this before you accept anything:

  • Video resolution should be sharp enough to read pipe markings, with consistent lighting and no motion blur through joints.
  • Every photo should be labeled with its defect code and distance, and should correspond to a specific point in the video timeline.
  • Inclinometer readings must appear on-screen throughout the survey, not just as a summary graph tacked on at the end.
  • Distance offsets are measured from the maintenance structure the survey started at, and errors compound fast if the crew mismeasures the starting chainage.

Power and Water’s CCTV standards call for inclinometer accuracy within about plus or minus 1%. Anything looser than that and grade readings on flat or near-flat pipe become unreliable.

Pro Tip: If the inclinometer graph looks suspiciously smooth with no minor fluctuation, ask for the raw WinCan file. A perfectly straight line often means the reading wasn’t live.

Why Do Councils and Utilities Reject CCTV Reports?

Rejections rarely come down to one catastrophic error. They’re usually a stack of small omissions that add up to a resubmission request, which costs everyone time and money.

The most common triggers:

  • No WinCan export, or a PDF-only submission with no underlying structured data.
  • Missing inclinometer readings, or a survey run in the wrong direction. TasWater’s CCTV specification requires downstream to upstream surveys, and getting that backwards is grounds for rejection.
  • Poor video quality, blurry footage, or defect screenshots that don’t exist at all.
  • Pipes surveyed without cleaning first, which hides genuine defects behind debris.
  • Access lids left closed or partially obstructed, breaking the continuity of the survey run.

The fix is scoping the inspection properly before the crew arrives, specifying WinCan deliverables, inclinometer accuracy, and survey direction in the brief. Our pipeline condition assessment guide walks through utility-level requirements in more detail.

How Should You Triage Defects and Plan Follow-Up Works?

Once the report checks out, the real work starts: deciding what needs action now versus what can wait.

  1. Grade 5 structural defects (collapse, severe deformation) go straight to excavation or replacement planning. Don’t wait for a second opinion.
  2. Grade 3 to 4 structural defects often suit relining or spot repair, and can be scheduled rather than treated as emergencies.
  3. Grade 1 to 2 or operational-only defects usually just need monitoring or a maintenance clean.
  4. When a defect needs physical access, non-destructive excavation avoids damaging surrounding services during potholing, which matters most in built-up utility corridors.

Every work order referencing the report should cite the defect code, distance offset, and photo or video timecode. Keep the video, WinCan file, and any CAD plan views for handover and warranty records.

Pro Tip: Attach the inclinometer graph to the work order for any relining job. Contractors quoting the repair need the gradient data as much as the defect list.

What Belongs in a Council Compliance Submission Package?

A submission package for council or utility acceptance needs to match what the asset owner will actually import into their systems.

  • WinCan export file
  • PDF summary report
  • Continuous HD video, one file per segment
  • Defect photos linked to timecodes
  • Inclinometer/inclination graph
  • Inspection metadata (crew, calibration, maintenance structure references)
  • CAD plan views, where the council requires as-constructed drawings
DeliverableFormatWhy it matters
WinCan exportStructured data fileImports directly into asset-management systems
PDF reportDocumentHuman-readable summary for reviewers
HD videoContinuous file per segmentPrimary visual evidence
Defect photosImage, linked to timecodeConfirms coded defects
Inclinometer graphPlotted dataVerifies gradient and calibration

Name your file sets consistently by segment ID and chainage before delivery, and always check whether the local utility, such as TasWater or Power and Water, has published a supplement to WSA 05 before you lock in the survey scope. Our CCTV drain mapping commissioning guide has a fuller breakdown of file naming conventions for civil handovers.

The Pressureworks Approach to Compliant CCTV Deliverables

The Pressureworks Approach to Compliant CCTV Deliverables — overview diagram

We code defects on-site into WinCan as the survey happens, not back at the office days later. That means the inclinometer reading you see on the report is the same one displayed live on-screen during the run, matched to WSA 05 codes as each defect appears.

Every job includes a full photo set per defect, continuous HD footage, and the complete data export, so clients never have to chase a missing file after submission. Our crews work under EPA licensing and accredited safety protocols, which matters when a CCTV survey feeds directly into a council compliance package rather than just an internal maintenance check.

— MYBMC

Get a Compliant CCTV Report the First Time

Re-survey costs more than the original inspection ever does, in both dollars and schedule slippage. Pressureworks is the alternative to sending a crew out twice: we scope the WinCan deliverables, inclinometer accuracy, and CAD plan views your council or utility expects before the camera goes in the pipe, so the report clears review on the first pass.

Pressureworks

If your project needs follow-up work once defects are confirmed, non-destructive excavation is often the safer path for exposing a section flagged for repair without damaging surrounding services. Ask us about non-destructive digging alongside your CCTV scope, and if your tender documents need a scope review before you send them out, ArosBid’s AI tender review tool can help tighten the brief.

Pressureworks serves civil, utility, and council projects across Victoria. Get in touch through our CCTV drain inspection service page to request a quote and pre-inspection scoping call before your next survey is booked.

Get a Compliant CCTV Report the First Time — overview diagram

Where to Verify WSA 05 and Local Utility Requirements

Standards get amended, and local supplements can override the national code. Before finalizing a decision, check the current WSA 05-2020 code from WSAA, and confirm whether your project sits under a local supplement.

  • TasWater’s CCTV requirements (TAMSTD14) for Tasmanian sewer inspections
  • Power and Water’s CCTV standards for Northern Territory submissions

Always pre-check with the receiving council or utility. Published supplements change faster than most contractors expect.